Ceiling Insulation Installation

In this video we show you how quick, clean and easy it is to install ceiling insulation using Earthwool® glasswool ceiling insulation.

    Don't forget to check out our DIY Safety Instructions and Precautions before you start.


        Ceiling Insulation Solutions

        In this video we show you how to install Earthwool® glasswool insulation correctly in the ceiling of your home. Please also find a text summary of the steps involved along with a link to important safety docs below. 

        How to install Ceiling Insulation using Earthwool glasswool: Ceiling Insulation Segments

        By installing Earthwool glasswool insulation you will improve the thermal efficiency of your home or building and save energy.

        Maintaining desired room temperature for comfortable living and working environments, EarthwooI glasswool ceiling insulation is a proven energy saver.

        Assess the ceiling condition and structure together with the method of installation you are to use based on the appropriate requirements established in the building code, site assessment and or plans provided. Installation must be completed to the requirements of relevant standard: AS 3999:1992 or NZS 4246:2006. 

        Tools required to install Earthwool Glasswool Insulation Ceiling Segments:

        • Sharp knife for trimming insulation
        • Ladder
        • Suitable clothing (see our Health and Safety Information)
        • Tape measure
        • Non-conductive insulation stick for positioning insulation in hard to reach areas
        • Kneeling board to span ceiling framing

        Step 1

        • Determine the most suitable product for your project. Ceilings can be insulated using rolls or segments.
        • Where you have existing ceiling insulation that is level with the ceiling joists, you can install additional insulation over the top. It is recommended that this is installed at right angles to the existing ceiling insulation.
        • Insulation is available in varying widths and thicknesses to suit most framing spaces. Please check Knauf Insulation’s product guide for the most suitable product for your application.
        • To calculate the number of packs needed, determine the area (m2) to be insulated by multiplying the length by the width or wall height. The number of m2 of insulation material is clearly marked on each pack. Divide the total area to be insulated by the m2 in a pack to determine the number of packs required (don’t forget to round up to the nearest whole pack). Allowances should be made for areas that are unable to be insulated. 

        Step 2

        • Don’t take the insulation out of the packaging until you’re in a position and ready to install.
        • Before installation, gently agitate the insulation by gently shaking or bouncing it on its side until it recovers to the thickness stated on the label.
        • Do not block ceiling vents and take care around downlights and other sources of heat. Consult the manufacturer’s instructions for appropriate clearances. Additional guidance is provided in AS 3999 and NZS 4246.

        Step 3:

        • Start installing the insulation at the far corners of the ceiling and work your way back towards the ceiling access.
        • When installing insulation between ceiling joists, ensure that you achieve a snug fit avoiding any gaps.
        • When installing insulation in truss roofs, ensure that insulation is firmly butted together to achieve a consistent layer of insulation without any gaps.
        • Where required, use a sharp knife to cut the ceiling insulation to fit. It is important that when you cut the insulation, you avoid coming into contact with any electrical services.
        • When installing insulation in a roof eave (i.e. where the roof joins the ceiling), make sure the insulation covers the top plate but is not in contact with the roof. It is important to maintain a 20mm gap between the roofing substrates and the insulation.

        Step 4:

        • Complete the final check of the insulation ensuring all areas have been insulated and that you have an even and consistent layer of insulation.
        • Finish your project by removing all packaging from the ceiling and disposing of all rubbish and excess insulation responsibly.

        Step 5

        • Once you have worked your way back to the ceiling access, make sure you insulate the ceiling access panel before exiting the roof space. We recommend that once completed another person checks the work to ensure it has been installed according to required standards.

              Keep up to date with Knauf Insulation on YouTube